KIA RIO

since 2000 of release

Repair and car operation



Rio KIA
+ 1.1. Short acquaintance to the car
+ 2. Engines A3E, A5D
+ 3. Greasing system
+ 4. Cooling system
- 5. Fuel system
   5.1. Specifications
   5.2. Elements of fuel system
   5.3. Corner of an advancing of ignition
   5.4. Frequency of rotation of idling
   5.5. Sensor of a measuring instrument of a consumption of air
   5.6. Detonation sensor
   5.7. Sensor of provision of a butterfly valve
   5.8. Check of the main relay
   5.9. Check of the relay of the fuel pump
   5.10. Check of tension of forward and back warmed sensors of oxygen
   5.11. Check of forward and back warmed sensors of oxygen
   5.12. Pressure removal in fuel system
   5.13. Toplivoprovoda
   5.14. Activization of fuel system
   5.15. Check of residual pressure in fuel system
   5.16. Check of fuel pipelines
   5.17. Check of fuel nozzles
   5.18. Quick-detachable connections
   5.19. Fuel pump
   5.20. Fuel tank
   5.21. Check of system of ventilation of a case (PCV)
   5.22. Check of system of catching паров fuels
   5.23. Check of the valve of system of catching паров fuels
   5.24. Check of the valve of closing of the canister
+ 6. Ignition system
+ 7. Coupling
+ 8. Transmission
+ 9. Axes and power shafts
+ 10. Suspension bracket
+ 11. Wheels and tires
+ 12. Steering
+ 13. Brake system
+ 14. Body
+ 15. Air central air
+ 16. Electric equipment


5.6. Detonation sensor

Check

PERFORMANCE ORDER
1. Disconnect the electric socket of the sensor of a detonation and remove the detonation sensor. Fix the detonation sensor in a vice and connect the voltmeter between plugs 1 and 2.
2. With a hammer sharply strike on a vice and watch voltmeter indications.
3. Check that the sensor of a detonation gives out peak tension (less than 1 In).
4. If peak tension is absent, replace the detonation sensor.

Removal

PERFORMANCE ORDER
1. Remove an arm of support of an inlet collector.
2. Disconnect a plait of wires of the sensor of a detonation.
3. Turn out a bolt and remove the detonation sensor.

Installation

PERFORMANCE ORDER
1. Establish the sensor of a detonation and fix it a bolt.
2. Establish a plait of wires of the sensor of a detonation.
3. Establish an arm of support of an inlet collector.